MV GNV Cristal
ex SNAV Sardegna, Pride of Le Havre, Olau Hollandia (II)
© Ulrich Streich
Steel twin screw motor vessel built in 1989 at Schichau Seebeckwerft AG, Bremerhaven, Germany (Yard No 1067) as a passenger car and commercial vehicle trailer ferry for Olau Line, Hamburg, Germany
Technical Data
- Length: 165.00 m (overall), 144 m (between perpendiculars)
- Breadth: 33.40m (extreme), 29.0m (moulded)
- Depth: 18.93m.
- Draught: 6.501m (maximum)
- Tonnage: 33,336 gross/17,001 net/5120 deadweight
- Engines: Four Zgoda-Sulzer 8ZA40S diesels
- Power: 19600 kW/26,646 hp
- Speed: 21.0 knots (23 knots max)
- Capacity: 1642 passengers 575 cars or 120 trailers.
- Call Sign: DNHO, MSTJ8, IBUB
- IMO Number: 8712518
- Official Number: 16100/725334
- MMSI Number: 247163900
- Registry: Hamburg/Germany 🇩🇪, Portsmouth/United Kingdom 🇬🇧, Napoli/Italy 🇮🇹
- Sister ships: Nils Holgersson (1059), Olau Britannia (II) (1068), Peter Pan (1058)
History
The second of a quartet of “Peter Pan” class built, at Schichau Seebeckwerft AG, Bremerhaven, between 1985 – 1989.
September 10th 1988: Keel struck.
February 25th 1989: Launched.
Courtesy of John Hendy
Courtesy of John Hendy (Trials)
© Ulrich Streich
September 29th 1989: Delivered to Olau Line (U.K) Ltd. Co, Hamburg, Germany.
© Simonwp (River Elbe, Hamburg 01/10/1989)
© Courtesy of John Hendy
October 4th 1989: Commenced services between Sheerness – Vlissingen.
© Courtesy of John Hendy (Left) and © Ted Ingham (Right)
© Jan Melchers (Left) and © Ken Larwood (Right)
January 6th 1993: Registered to SCI Shipping, Luxemburg.
February 3rd 1993: After disputes with the German trade union, re-registered in Germany, the home port of Hamburg.
1994: After a dispute between the German seafarers’ union and the owners the services were considered unreliable and traffic figures dramatically reduced. Her owners had thoughts of putting the ship on Trelleborg – Travemünde TT-Line, and move other vessels to Olau Line. That would in turn transfer them to the Bahamas flag and not satisfy the German seafarers’ union. A further strike was declared which resulted in Olau closing the service and putting vessels out to charter.
May 15th 1994: Final day in service between Sheerness – Vlissingen.
May 1994: Registered to Island Shipping Ltd, Portsmouth, England (Management P&O European Ferries, Portsmouth).
June 3rd 1994: Renamed PRIDE OF LE HAVRE.
June 1994: Commenced services between Portsmouth – Cherbourg.
© Brian Fisher (Left) and © Ken Larwood (Right)
June 22nd 1994: Services between Portsmouth – Le Havre.
1999: Continued services between Portsmouth – Le-Havre but under P&O Portsmouth.
Dover Ferry Photos Library
March 18th 1999: Suffered a small engine-room fire and repaired in Southampton.
March 24th 1999: Returned to service after repairs.
© Frank Heine (Le Havre, 18/06/2002)
October 15th 2002: Commenced services for P&O Ferries between Portsmouth – Cherbourg/Le Havre.
© John Jones (Left) and © Simonwp (Right)
December 1st 2004 – January 16th 2005: Refit.
© Krispen Atkinson
September 30th 2005: Final day in service between Portsmouth – Le Havre.
October 2nd 2005: Left Portsmouth for Falmouth.
October 2nd 2005: Laid up on the River Fal.
© Krispen Atkinson
November 2005: Sold to SNAV, Italy.
© Krispen Atkinson
December 8th 2005: Floated to Falmouth for refit prior to delivery.
December 30th 2005: Renamed SNAV SARDEGNA.
January 5th 2006: Left Falmouth for Naples.
© Enrico Righetti (Naples, 17/01/2006)
March 27th 2006: Registered to Sardegna Naviera SA, Naples, Italy.
May 2006: Commenced services between Civitavecchia – Palermo.
June 2006 – September 30th 2006: In partnership with Moby Lines sailed between Civitavecchia – Olbia.
2007: Commenced services between Olbia – Civitavecchia.
© Frank Heine (Olbia, 27/07/2007)
October 1st 2010: Services between Naples – Palermo.
© Wil Weijsters (Naples, 12/11/2010)
May 2011: Registered to Snav Spa, Naples, Italy.
© Frank Heine (Palermo, 03/08/2013)
August 2013: Continues services between Naples – Palermo – Sete – Barcelona.
© Josep Pretel (Barcelona, 03/12/2015)
© Frank Heine (Sète, 28/07/2016)
April 1st 2017: Renamed GNV CRISTAL.
© Frank Heine (Palermo, 06/08/2017)
© Gerolf Drebes (Sete, 12/10/2021)
April 2022: Services Barcelona – Nador – Sete – Tangier.
October 7th 2022: Laid up in Naples
January 16th 2023: Arrived in Sete and sailed to Palermo.
January 18th 2023: Took up services Palermo – Naples.
May 2023: In service Rades (Tunis) – Genoa.
January 16th 2023: Arrived Sete.
January 16th 2023: Left Sete for Palermo.
January 19th 2023: Took up service Palermo – Naples.
March 2024: Laid up in Naples.
August 21st 2024: Left Naples for Palermo and took up services Naples – Palermo.
October 2024: Services Genoa – Malta.
🆕 © Jeffess (Vallta, 27/01/2025)
March 19th 2025: Arrived Barcelona and operated services Barcelona – Mahon, Menorca.
May 2025: Barcelona – Nador – Sete – Tanger Med.
September 28th 2025: Completed services and laid up in Naples.
October 11th 2025: Round trip Civitavecchia – Rades
October 20th 2025 – November 1st 2025: Services Bari – Durres.
January 21st 2026: Completed service Bari – Durres and sailed to Sete.
February 1st 2026: Services Sete – Barcelona – Nador/Tanger Med.
All information is believed to be correct and no responsibility is accepted for any errors or omissions. All items included in this article are subject to © copyright. We would like to take this opportunity of thanking: Krispen Atkinson, Gerolf Drebes, Brian Fisher, Frank Heine, John Hendy, Ted Ingham, Jeffess, John Jones, Ken Larwood, Captain Jan Melchers, Josep Pretel, Enrico Righetti, Simonwp, Robert J Smith, Ulrich Streich, Wil Weijsters and Andreas Wörteler for their assistance in producing this feature. A special thanks goes to John Hendy.









































