MV Shetland Trader
Ex Lass Mars, Mars
© Fotoflite
Steel twin screw motor vessel built in 1992 by Rosslauer Shipyard Elbe (Yard No 233) as a General Cargo Ship.
Technical Data
- Length: 74.94 m (overall) 70.47 m (between perpendiculars)
Breadth: 11.40 m
Depth: 5.6 m
Draught: 4.352 m (Summer) 4.2 (Winter)
Tonnage: 1512 gross/ net/t deadweight
Engines: 2 x Cummins KTA19m diesels
Power: 1194 kW/1623 bHP
Speed: 10.2 knots (Max) 9.0 knots (Service) - Capacity: Grain: 90,543 Bale: 90,543
- Call Sign: DQFK, 8PUM
MMSI Number: 314257000 - IMO Number: 9030486
- Official Number: 733513
- RI Number: 100549
- Port of Registry: Rostock/Germany 🇩🇪, Bridgetown/Barbados 🇧🇧
Sister Ships: Sun (231), Lass Moon (232), Lass Uranus (234), Lass Neptune (235), Lass Saturn (236)
Current AIS Location
Please note that this specific vessels AIS position data may be over an hour old and that the vessels position will only be displayed when it is within range of the VesselFinder AIS system. The AIS transponder/ship position data featured on this page is intended for information purposes only and it is in no way related to the 'Safety of Navigation at Sea'. All the AIS ship position data featured within this article is provided by VesselFinder and we are therefore not responsible for its content or its accuracy.
History
October 1st 1991: Keel laid.
December 23rd 1991: Launched as MARS.
July 1st 1992: Completed as LASS MARS for S.K.R Küstenmotorshiff – Reederi GmbH & Co KG (H.H Wübbe Nachfogel GmbH Hamburg as manager ) Rostock Germany.
© Mike Griffiths (Rozenburg, 1992) (Left) © © Fotoflite (Right)
© Gerolf Drebes (Cuxhaven, 06/09/2006)(Left) © Hans Deijs (Antwerp, 2006) (Right)
August 12th 2007: SHETLAND TRADER for Owner/Manager; Faversham Ships Ltd.
© Trevor Kidd (Belfast, 08/02/2008)(Left)(Belfast, 12/10/2008)(Right)
February 26th 2014: Detained at Northfleet, Kent, UK.. Summary: ten deficiencies with one ground for detention.
© Marcel and Ruud Coster (Ijmuiden, 10/05/2018)
© Marcel and Ruud Coster (Ijmuiden, 26/10/2020)
© Aleksi Lindström (Maasvlakte, Rotterdam 27/09/2021)
October 28th 2021: Due at Dover.
November 22nd 2022: Arrived at Dover.
December 20th 2022: Provisionally due at Dover.
October 9th 2023: Called at Dover.
January 28th 2024: Provisionally due at Dover.
All information is believed to be correct and no responsibility is accepted for any errors or omissions. All items included in this article are subject to © copyright. We would like to take this opportunity of thanking: Marcel and Ruud Coster, Hans Deijs, Gerolf Drebes, Fotoflite, Mike Griffiths and Trevor Kidd for their assistance in producing this feature.
Article © Nigel Thornton and Ray Goodfellow (Dover Ferry Photos Group)