Cargo VesselsPast and Present

MV Charles Island – Past and Present

IMO Number: 9059626

MV Charles Island

© Erwin Willemse

© Erwin Willemse (IJmuiden, 19/04/2019)

Steel single screw motor vessel built in 1993 by Danyard, Frederikshavn, Denmark (Yard No 718) as a Refrigerated Cargo ship

Technical Data

  • Length: 178.50m (overall) 166.70m (between perpendiculars)
  • Breadth of hull: 25.24m (overall)
  • Depth: 13.20m
  • Draught: 9.20m (max)
  • Tonnage: 14,061 gross/14,140 deadweight
  • Engines: 1 x MAN-B&W/Mitsui 8S60 8 – cylinder diesel
  • Power: 16320kW/22189 bhp
  • Speed: 21.5 knots
  • Capacity: 17,637m³/434 x 20 ft containers
  • Cargo Gear: 3 x Cranes of a lifting capacity of SWL 40 t each/4x Cranes of SWL 10 t each
  • Call Sign: C6JT
    MMSI Number: 308705000
  • IMO Number: 9059626
    Port of Registry: Nassau/Bahamas 🇧🇸
    Sister Ships: Abermarle Island (716), Barrington Island (717), Duncan Island (719),  Hood Island (722)

 


Current AIS Location


Please note that this specific vessels AIS position data may be over an hour old and that the vessels position will only be displayed when it is within range of the VesselFinder AIS system. The AIS transponder/ship position data featured on this page is intended for information purposes only and it is in no way related to the 'Safety of Navigation at Sea'. All the AIS ship position data featured within this article is provided by VesselFinder and we are therefore not responsible for its content or its accuracy.


History

1993: Launched for KS Difco LXXXIII, Copenhagen (Ecuadorian Line Inc., Miami). Christened CHARLES ISLAND. (Denmark)

© Capt Jan Melchers

© Capt Jan Melchers

November 5th 1993: Completed for Ecuadorian Line Inc. (Napaca, Naviera del Pacífico CA, Guayaquil), Nassau.

May 1st 2003: Registered owner: Harbour Island Shipping Ltd. Nassau. Bahamas. Operated by Ecuadorian Line Inc. (Miami)

© Stan Muller (Antwerp, 17/02/2008)

© Robert Fournier (Dunkerque, 27/06/2011)

April 15th 2021: Arrived at Dover.

Dover Strait Shipping

August 14th 2022: Due at Dover.

October 2nd 2022: Due at Dover.

January 23rd 2023: Arrived at Dover.

© John Pegden © John Pegden

🆕 © John Pegden (Dover, 23/01/2023)

March 13th 2023: Provisionally due at Dover.

 


All information is believed to be correct and no responsibility is accepted for any errors or omissions. All items included in this article are subject to © copyright. We would like to take this opportunity of thanking: Robert Fournier, Capt Jan Melchers, Stan Muller, John Pegdan, Nigel Scutt (Dover Strait Shipping) and Erwin Willemse for their assistance in producing this feature.

Article © Nigel Thornton and Ray Goodfellow (Dover Ferry Photos Group)

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button